On the morning of February 6, 2025 (the 9th day of the Lunar New Year), a significant event took place at the Ca Mau Gas – Power – Fertilizer Industrial Complex: the Contract Signing & Groundbreaking Ceremony for the 12,000-Ton Additional Warehouse Project at Ca Mau Fertilizer Plant.
The ceremony was solemnly organized by the Trung Hau Construction JSC – Central Construction JSC Joint Venture, under the leadership of Ca Mau Fertilizer JSC (PVCFC), with a total contract value of VND 146 billion.
This event is not merely a ceremony but a strategic milestone, marking the partnership between Trung Hau – Central Joint Venture and Ca Mau Fertilizer JSC. The project is designed on an impressive scale, with a construction land area of 28,262 m², including 16,560 m² of warehouse floor space.
The project will not only include fertilizer storage facilities but also integrate modern technical systems such as electrical, lighting, lightning protection, audio, CCTV, water supply & drainage, fire protection (PCCC), and ventilation systems.
In addition, site development works such as weak soil removal, land leveling, internal road construction, stormwater drainage systems, foundations, perimeter fencing, and reinforced concrete sheet pile walls will be executed comprehensively to ensure optimal quality and progress.
With the motto “Reputation First” and extensive experience from numerous successful domestic and international projects, the Trung Hau – Central Joint Venture is committed to delivering the project safely, on schedule, and to the highest quality standards.
The trust from the Investor—represented by the Project Management Unit and the Ca Mau Fertilizer Plant’s Board of Directors, along with the support of design consultants and supervision consultants, will be a strong driving force for the project’s success.
We extend our best wishes to Ca Mau Fertilizer JSC, hoping the company continues to grow sustainably and achieve even greater success in both the Vietnamese and international markets.